Origin Place | 广东省 | Model No. | G350 |
Payment Terms | FOB | Certification | CE, ISO9001, TUV |
Customization | Available | Customized Request | After-sales Service | Every 2 Year |
Warranty | 1 Year | Type | Gear Hobbing Machine |
CNC or Not | CNC | Voltage | 380V |
Certification | CE, ISO9001, TUV | Guarantee | 1year |
Transport Package | Standard Export Box | Trademark | GEEPRO |
HS Code | 845969900 | Production Capacity | 300-500PCS/Year |
GEEPRO G350 6-axis High Speed CNC Gear hobber machine for cutting max Dia 350mm&modules 8m
G350 The main technical parameters | |||
The largest machining diameter | mm | 350 | |
The largest processing module | m | 8 | |
Worksurface daimeter | mm | 350 | |
The largest diameter cutter | mm | 150 | |
The biggest tool length | mm | 180 | |
The use of tool rod specifications | mm | 32/40 | |
Hob shift distance | mm | 140 | |
Highest hob shaft speed | rpm | 1900 | |
Works piece axis of the highest speed | rpm | 200 | |
Deg | ° | ±45° | |
X axis maximum fast moving speed | mm | 3000 | |
Y axis maximum the most moving speed | 2000 | ||
Z axis maximum fast moving speed | mm | 3000 | |
Machine tool appearance size | 2970X1830X2880 | ||
Machine weight | kg | about 85000 | |
The standard configuration | |||
Numerical control system | eletric cabinet | hydraulic system | wet-cut cooling system |
Direct drive motor | Ø16/22 tool rod | Automatic lubrication system | Iron filings recovery unit |
iron gasket for machine tool | The toolkit | Electrical cabinet air conditioning | Oil cooler |
Hydraulic clamping cylinder assembly | Chip conveyor | Grating ruler | |
Optional configuration | |||
Dry-cut gas-cooled Micro-lubrication device | Oil mist separator | Tooling fixture | Automatic feeding and unloading device |
Precision Scraping Double Tool Setting Device | Automatic broach device |
Business Type: Machinery & Equipment
Main Products: Grinding Machine,Gear Cutting Machine,Drilling Machine,CNC Machine Tools,Boring Machine
Number of Employees: 100
Year of Establish ment: 2009
Off Season Lead Time: within 15 workdays
Peak season lead time: within 15 workdays